"My arrangement with the museum is that my schedule is mine to figure out. There are times when I have to be present in Des Moines, such as a month or so before the installation of a new exhibition. When I am in Des Moines I work very intensely, plan, and do much in advance to enable myself to be away for my regular two-month absences."

Quote Details